龙凤上海shlf1314论坛

 Home piping
Your current location: home page > News > common problem

contact us Contact Us

Chongqing Berkeley Trade Co., Ltd

China Operation Center: 4001587716

Tel.: 023-67645717/023-63073573

Mobile: 13983628496/13808329283

Email: [email protected]

Website: qybb.com.cn

Office: Room 401, Building 3, No. 45, Shiguang Road, Zhongcun Town, Zhonger Industrial Zone, Panyu District, Guangzhou City, Huajia Pilot Industrial Park

Guangzhou Exhibition Hall: Booth B-1-823, No. 664, Huangpu Avenue Middle, Tianhe District, Guangzhou

Chongqing Operation Center: 2904, Building 1, Xiyue, Yorkshire, Jinzhou Avenue, Yubei District, Chongqing


What precautions should be taken during the installation of stainless steel water pipes?

2023-06-06 20:28:30
second

As people attach importance to the health of drinking water, more people choose Stainless steel pipe It is used as drinking water pipeline. Then, in different installation projects, Stainless steel water pipe What are the precautions in the overall installation process Stainless steel water pipe manufacturer Let's talk about:

 Stainless steel water pipe manufacturer

1、 Requirements for mounting bracket

1. The spacing between supports of thin-walled stainless steel pipes should not be greater than that specified in the following table. The spacing between fixed supports of hot water pipes should be determined according to the thermal expansion amount of the pipeline, the allowable compensation amount of expansion joints, etc. The contact between the fixed support and the pipeline shall be tightly fixed and firm. The movable support shall be flexible, and a gap of 3-5 mm shall be left between the sliding bracket and the sliding bracket. The large bearing spacing of thin-walled stainless steel pipes can be determined according to the data in the following table.

2. The movable support of the exposed pipeline should adopt stainless steel pipe clamp, and the nominal diameter of the Pipe installation Plastic pipe clamps can also be used. If other metal (except copper) supports or pipe clamps are used, soft spacers such as wood or rubber should be used between the contact surfaces on both sides.

3. Metal pipe clamps or hangers shall be used to fix the water supply hydrants and water distribution points, and the pipe clamps or hangers should be set 40mm-80mm away from the distribution point.

2、 Concealed burial, wall penetration and protection

1. The buried pipe shall be protected from the acid and alkali corrosion of the soil on the outer wall of the pipe or the damage of sharp and hard sundries. Binding anti-corrosion measures should be taken, such as wrapping two layers of polyethylene tape, or coating epoxy resin, and then wrapping glass fiber plastic cloth.

2. Pipe sleeves shall be set when the pipeline passes through the floor slab and load-bearing wall. The diameter of the embedded sleeve shall be 1-2 larger than that of the stainless steel pipeline. Plastic pipes can be used as pipe sleeves. When the pipeline passes through the roof and basement exterior wall, metal pipe sleeves should be used. Plastic pipes can be used in other occasions. The sleeve should be 20mm higher than the ground and roof (50mm should be taken in the toilet or kitchen) and strict water defense measures should be taken.

3. When laying pipes, there shall be no axial distortion. When crossing walls and floors, there shall be no forced correction. After installation, there shall be no waist collapse, arching waves and twisted snaking.

4. When the pipeline is buried, it should be below the local frozen line. If it is to be laid above the frozen line, reliable insulation and moisture-proof measures should be taken. In non frozen areas, when the pipeline is buried, the buried depth of the pipe top should not be less than 50cm, and the buried depth of the part crossing the road should not be less than 70cm. 5. The width of wall slot of wall embedded concealed pipe can be the outer diameter of pipe plus 50mm, and the depth can be the outer diameter of pipe plus 15-30mm.

Recent browsing:

Chongqing Berkeley Trade Co., Ltd

contact information

4001587716 / 023-67645717  / 023-63073573 
13983628496  / 13808329283 


Outlet exhibition hall: Room 2904, Building 1, Xiyue, Yorkshire, Jinzhou Avenue, Yubei District, Chongqing

qybb.com.cn