龙凤上海shlf1314论坛

 Stainless steel water pipe
Your current location: home page > Product display > Shark piping system

contact us Contact Us

Chongqing Berkeley Trade Co., Ltd

China Operation Center: 4001587716

Tel.: 023-67645717/023-63073573

Mobile: 13983628496/13808329283

Email: [email protected]

Website: qybb.com.cn

Office: Room 401, Building 3, No. 45, Shiguang Road, Zhongcun Town, Zhonger Industrial Zone, Panyu District, Guangzhou City, Huajia Pilot Industrial Park

Guangzhou Exhibition Hall: Booth B-1-823, No. 664, Huangpu Avenue Middle, Tianhe District, Guangzhou

Chongqing Operation Center: 2904, Building 1, Xiyue, Yorkshire, Jinzhou Avenue, Yubei District, Chongqing


Remove the caliper

2021-03-09 17:02:18
second
 Remove the caliper
Detailed introduction:

 Remove the caliper

stay Drainage pipeline The pipe clamp needs to be removed for adjustment or removal when installing pipe fittings. The pipe removal clamp can be used for easy and quick removal. The size of the pipe removal clamp is 1/2 ″~1 ″.

size

model

1/2″ Disconnect Tong
U711
3/4″ Disconnect Tong
U713
1″ Disconnect Tong

U715
















The following is about Domestic water pipe What should we pay special attention to during construction and assembly?   

1. Personnel working through Pipe installation Technical training on.

2. The opening position of the pipeline system during assembly needs to be sealed in time.

3. Materials with damage traces cannot be used. If the quality of the pipeline is found to be abnormal, technical identification or re inspection shall be carried out before use.

4. During construction and assembly, it is necessary to recheck the pressure level and application environment of cold and hot water pipes. The marks of the pipes should face outward and be in a prominent position.

5、 Home piping In the process of assembly, there should be no axial bending and twisting. When crossing walls or floors, it is not suitable to force correction. When laying water polypropylene pipes in parallel with other metal pipes, there should be a specific protection interval. The clear distance should not be less than 100 mm, and polypropylene is suitable for the inside of metal pipes.

6. The exposed pipes in the house are suitable for implementation after the finishing of civil engineering. Before assembly, it is necessary to help civil engineering accurately reserve or embed holes and sleeves.

7. When the pipeline passes through the floor, it needs to be equipped with steel casing, which should be 50mm higher than the ground, and waterproof measures should be taken. When the pipeline passes through the roof, strict waterproof measures should be taken.




Previous: Pipe clamp 2021-03-09
Next: Remove the U-clip 2021-03-09

Recent browsing:

Chongqing Berkeley Trade Co., Ltd

contact information

4001587716 / 023-67645717  / 023-63073573 
13983628496  / 13808329283 


Outlet exhibition hall: Room 2904, Building 1, Xiyue, Yorkshire, Jinzhou Avenue, Yubei District, Chongqing

qybb.com.cn