龙凤上海shlf1314论坛

 Stainless steel water pipe
Your current location: home page > Product display > Charlotte water pipe

contact us Contact Us

Chongqing Berkeley Trade Co., Ltd

China Operation Center: 4001587716

Tel.: 023-67645717/023-63073573

Mobile: 13983628496/13808329283

Email: [email protected]

Website: qybb.com.cn

Office: Room 401, Building 3, No. 45, Shiguang Road, Zhongcun Town, Zhonger Industrial Zone, Panyu District, Guangzhou City, Huajia Pilot Industrial Park

Guangzhou Exhibition Hall: Booth B-1-823, No. 664, Huangpu Avenue Middle, Tianhe District, Guangzhou

Chongqing Operation Center: 2904, Building 1, Xiyue, Yorkshire, Jinzhou Avenue, Yubei District, Chongqing


Oblique 3-way (HxHxH)

2021-03-11 17:50:08
second
 Oblique 3-way (HxHxH)
Detailed introduction:

 Oblique 3-way (HxHxH)

Size:
 1-1/2"(38.1mm)
 2"(50.8mm)
 3"(76.2mm)
 4"(101.6mm)



To ensure that Home piping Proper application requires Water pipe installation Pay attention to a series of regulations Pipe manufacturer I'll introduce you Domestic water pipe Installation regulations of.

1. Before installing the household water pipe, first check the position, direction and design elevation to see if the original water pipe is straight and smooth;

2. Do not change it during installation Drainage pipeline Waste and wastewater characteristics and parts of odor proof floor drain and toilet. The drainage pipeline has a trap to prevent the odor from draining down;

3. The installation of domestic water pipes should be exposed and fixed firmly;

4. To living balcony Stainless steel water pipe Refit the gate valve and minimize the connection head in the middle;

5. The exposed screw thread interval of the hot water pipe is determined according to the specific specifications of the faucet, and the exposed two screw threads are on the same level; The exposed protruding mortar surface of the screw thread shall not be less than 10-15mm, and the fixed heating pipe shall be fixed with mixed mortar or caulking gypsum. The deep layer buried into the wall shall ensure that the thickness of the mixed mortar protective layer above 1mm outside the domestic water pipe to prevent the wall from cracking in case of heat;

6. When the early project is completed, 1~2 temporary water taps shall be installed on the construction site, and the list of materials required in the middle and later stages shall be presented for purchase.



Previous: Straight 3-way (HxHxH) 2021-03-11
Next: Oblique 3-way (HxHxH) 2021-03-11

Recent browsing:

Chongqing Berkeley Trade Co., Ltd

contact information

4001587716 / 023-67645717  / 023-63073573 
13983628496  / 13808329283 


Outlet exhibition hall: Room 2904, Building 1, Xiyue, Yorkshire, Jinzhou Avenue, Yubei District, Chongqing

qybb.com.cn